Pungo Ferry Road Improvements
Raising Pungo Ferry Road from Blackwater Road to the west side of the Pungo Ferry Bridge to reduce recurring flooding and sea level rise effects.
Waste Collections to begin at 6 a.m. due to extreme heat. Please have all carts and scheduled items at the curb the night before or by 6 a.m. on your collection day.
The Landfill & Resource Recovery Center will be open on Friday, July 3, and closed on Saturday, July 4, in observance of the Independence Day holiday. Solid waste and recycling remains unchanged for July 3, however the Waste Management administrative offices will be closed. Please view the City's Independence Day operating schedule for more information.
Learn More
Raising Pungo Ferry Road from Blackwater Road to the west side of the Pungo Ferry Bridge to reduce recurring flooding and sea level rise effects.
A public hearing for the Environmental Assessment (EA) was held on Thursday, June 18, at Creeds Elementary School.
This project is part of the Southern Rivers Flood Protection Program Master Project. It will raise Pungo Ferry Road from Blackwater Road to the west side of the Pungo Ferry Road Bridge approach, a distance of about two miles.
The road will be raised to minimize recurring flooding and address sea level rise where practicable. The project will include shoulder and fill slope improvements. Streetlights do not exist beyond the Pungo Ferry Bridge and will not be included with this project.
Traffic control will be designed to allow construction with single-lane closures.
Project Cost
Design:
$6,415,000
Site Acquisition:
$143,104
Construction:
$95,000,000
Total:
$101,701,208
Project Schedule
Design:
December 2022 through August 2028
Site Acquisition:
January 2027 through March 2028
Construction:
September 2028 through September 2031
Please contact the Stormwater Engineering Center with any questions or concerns regarding the Southern Rivers Watershed and stormwater-related activities and assessment.
Questions or concerns regarding the Roadway Construction Projects can be directed to Project Manager Christina Ammens, P.E. at 757-385-8439 or CAmmens@vbgov.com.
The Flood Protection Program’s Monthly Status Reports, including project-specific information, can be found on the Flood Prevention Bond Referendum Oversight Board’s page.