Project Status and Funding Source

As of September 2025, the design consultant is working towards plan, specification and estimate (PS&E) approval to finalize the design process.

This project is funded by CIP 100597.

This project includes design and construction of drainage improvements within the Eastern Shore Drive area at four side streets and includes curb and gutters, utility adjustments and storm piping/drainage inlets. This project will be constructed in conjunction with the Shore Drive Phase III Roadway Project (CIP 100381).

Want more information?

For more project-specific information, check out the Flood Protection Program's Monthly Status Reports, which can be found on the Flood Prevention Bond Referendum Oversight Board's page.