Project Status and Funding Source

100% design is being finalized.

This project is funded by CIP 100599.

This project includes replacing the existing pump station on Sandalwood Road. Collection system improvements will be constructed along Sandalwood Road, Bayberry Street and Poinciana Drive. The current proposed outfall force main alignment is down the center of Sandalwood Road.

Want more information?

For more project-specific information, check out the Flood Protection Program's Monthly Status Reports, which can be found on the Flood Prevention Bond Referendum Oversight Board's page.