Project Status and Funding Source

Phase 1A: The project timeline has been adjusted to begin construction following the completion of Phase 1B.
Phase 1B: Design is anticipated to begin in 2026.

This project is funded by CIP 100596.

This project includes design and construction of improvements to alleviate widespread flooding due to moderate rain events impacting the Church Point, Thoroughgood, and adjacent neighborhoods, along with portions of Pleasure House Road and Northampton Boulevard US13. 

The improvements must be phased to prevent adverse downstream impacts:

Phase 1A - BMP and Church Point Drainage Improvements

  • New large storm drainpipes and structures.
  • New wet pond.

Phase 1B - Pleasure House Rd and Northampton Blvd culvert improvements

  • New large storm drainpipes and structures.
  • New culvert crossing under Shore Drive.
  • New larger culvert crossings under Pleasure House Road and Northampton Boulevard.
  • Improvements between Pleasure House Road and Northampton Boulevard.

Want more information?

Sign up to receive email updates on the Lake Bradford – Chubb Lake Master Program. Or for more project-specific information, check out the Flood Protection Program’s Monthly Status Reports, which can be found on the Flood Prevention Bond Referendum Oversight Board’s page.