Project Status and Funding Source

This project was completed in September 2023 and the project is currently in the warranty period.

This project was funded by CIP 100229.

This project was an early improvement project for the installation of storm drainpipes from Lake Pleasure House to the existing stormwater pump station to allow the water levels within the lake to be better maintained. This project was bounded on the north by Lauderdale Avenue, east by Fentress Avenue, south by Lookout Road, and west by Beaufort Avenue.

Want more information?

Sign up to receive email updates on the Lake Bradford – Chubb Lake Master Program. Or for more project-specific information, check out the Flood Protection Program’s Monthly Status Reports, which can be found on the Flood Prevention Bond Referendum Oversight Board’s page.