Project Status and Funding Source

The 30% design submittal has been received and reviewed. The design-build team is progressing towards a 60% design submittal next year. Limited construction work may begin towards the end of 2027. 
This project was funded by CIP 100595.

This project includes the design and construction of a large-scale stormwater pump station (375 cubic foot per second capacity) and associated improvements with an outfall at/near to the shoreline of the Chesapeake Bay adjacent to Lake Bradford/Chubb Lake.