All Virginia Beach government administrative offices will be closed on Monday, Sept. 1, in observance of the Labor Day holiday. Waste Management services are not impacted since curbside collections and the Landfill and Resource Recovery Center do not operate on Mondays. Some City facilities will be open for business. For a full list of open locations and services, please read the Labor Day operating schedule.
Learn MoreStorm drainpipe improvements, additional stormwater culverts under highways, tide control devices such as mechanized sluice gates, stormwater pond improvements, channel/ditch clearing, detention and retention ponds, and possible stormwater pump stations.
As of August 2025, Notice to Proceed (NTP) was given to the Design-Build team and evaluation and planning has commenced. A Community Meeting will be planned by the end of the year to share these findings.
This project was funded by CIP 100595.
This project includes the design, property acquisition, private utilities, inspection services, and construction of storm drain improvements, flow control, and a large-scale stormwater pump station complex (375 cfs) and associated improvements with an outfall at/near to the shoreline of the Chesapeake Bay adjacent to Lake Bradford/Chubb Lake.
Sign up to receive email updates on the Lake Bradford – Chubb Lake Master Program. Or for more project-specific information, check out the Flood Protection Program’s Monthly Status Reports, which can be found on the Flood Prevention Bond Referendum Oversight Board’s page.