Project Status and Funding Source

A design-build team has been awarded to design and construct this project. The design-build team first completed an access route evaluation and are now progressing towards a 30% design submittal near the end of 2026.
This project was funded by CIP 100595.

This project includes the design and construction of a large-scale stormwater pump station (375 cubic foot per second capacity) and associated improvements with an outfall at/near to the shoreline of the Chesapeake Bay adjacent to Lake Bradford/Chubb Lake.

Want more information?

Sign up to receive email updates on the Lake Bradford – Chubb Lake Master Program. Or for more project-specific information, check out the Flood Protection Program’s Monthly Status Reports, which can be found on the Flood Prevention Bond Referendum Oversight Board’s page.