Storm drainpipe improvements, additional stormwater culverts under highways, tide control devices such as mechanized sluice gates, stormwater pond improvements, channel/ditch clearing, detention and retention ponds, and possible stormwater pump stations.

Project Status and Funding Source

As of August 2025, Notice to Proceed (NTP) was given to the Design-Build team and evaluation and planning has commenced. A Community Meeting will be planned by the end of the year to share these findings.

This project was funded by CIP 100595.

This project includes the design, property acquisition, private utilities, inspection services, and construction of storm drain improvements, flow control, and a large-scale stormwater pump station complex (375 cfs) and associated improvements with an outfall at/near to the shoreline of the Chesapeake Bay adjacent to Lake Bradford/Chubb Lake.

Want more information?

Sign up to receive email updates on the Lake Bradford – Chubb Lake Master Program. Or for more project-specific information, check out the Flood Protection Program’s Monthly Status Reports, which can be found on the Flood Prevention Bond Referendum Oversight Board’s page.