Project Status and Funding Source

As of December 2024, construction is substantially complete. The final inspection and project close-out are expected to be completed by January 2025.

This project was funded by CIP 100486.

Project Scope

This project replaced storm drain piping, with additional, larger drainage inlets, and water distribution pipes along Old Forge Court, Old Forge Road to Red Lion Road, and along Red Lion Road to the Windsor Woods Canal. Sanitary sewer improvements along Old Forge Court were also included.

New storm drain outfalls were placed into the Windsor Woods Canal at Red Lion Road. The new pipe is an elliptical pipe (91-inch x 58-inch), which is equivalent to a 72-inch circular pipe. This pipe replaces an older, undersized 27-inch drainage pipe. This increased pipe size has additional capacity to convey storm volumes and reduce roadway flooding. A trench support box was installed and wood framing to cast-in-place a new storm catch basin to replace an aged storm structure on Old Forge Road near Red Lion Road.

These new drainage systems, in conjunction with the Windsor Woods Tide Gate along Thalia Creek, the future stormwater pump station and regular maintenance, will assist in mitigating the flooding in Windsor Woods.

Quick Facts

Project Phases

Cost

Schedule

Project Phases

Design

Cost

$$$$$

Schedule

TBD

Project Phases

Site Acquisition

Cost

$$$$$

Schedule

TBD

Project Phases

Public Utility Adjustments

Cost

$$$$$

Project Phases

Construction

Cost

$6,600,000

Schedule

Completed in December 2024

Project Phases

Total Cost

Cost

$6,600,000

Want more information?

Sign up to receive email updates on the Flood Protection Program projects in Windsor Woods, Princess Anne Plaza and The Lakes. Or for more project-specific information, check out the Flood Protection Program’s Monthly Status Reports, which can be found on the Flood Prevention Bond Referendum Oversight Board’s page.