Purpose of the Project
The pollutant removal benefits will be credited toward the City's requirement for local bacteria total maximum daily load. This project will include the removal of an existing stormwater management facility (SWMF) with ongoing maintenance issues. The new SWMF will replace the existing facility.
How the Project Improves Water Quality
The project will remove an existing dry detention SWMF at the rear of Brooklyn Court and construct a new SWMF within the public right-of-way along Brooklyn Avenue. The facility will consist of a manufactured treatment device to remove stormwater pollutants from the drainage area around Brooklyn Avenue, consisting of approximately 16.60 acres.
Quick Facts